ESG News For Services industriels de Genève
These sites contributed news to this page:
-
Production target exceeded: 157 MWh (1.92 kWh/m²/day) of thermal energy produced; 30% of total annual target during winter months aloneSolar heat delivered even in winter: the solar array produces hot water at over 80°C even in winter, covered with snowContinuous operation: solar field supplied the district heat network 96 days out of 102, despite high temperature requirements and difficult winter conditionsProven and replicable renewable heat solution: TVP solar thermal fields and performance can be replicated in any existing heating network
We use cookies to improve the usability of our site and to analyze traffic patterns so we can improve our utility. Please agree to our use of cookies.